PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Constructing the slip forms at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Steel Truck -1 at Cherry St. (800x600).jpg Steel Truck -2 (close up) at Cherry St. (800x600).jpg Steel Truck -2 at Cherry St. (800x600).jpg Steel Truck -3 at Cherry St. (800x600).jpg Fully assembled crane Facing West (800x600).jpg Repaired anchor bolts at c.l ----- (800x600).jpg Repared anchor bolts at c.l [[[[ (800x600).jpg Waterproofing along foundation walls at Elev. 4-Stair -2 (800x600).jpg
Previous pageNext page Steel Truck -3 at Cherry St. (800x600)
Steel Truck -3 at Cherry St. (800x600)